Advanced Well Completions: Kuala Lumpur
£2,950
Advanced Well Completions: Kuala Lumpur

Advanced Well Completions: Kuala Lumpur

Event Information

Share this event

Date and Time

Location

Location

No.1 Jalan Utarid U5/13 Section U5

Kuala Lumpur, Selangor 40150

Malaysia

Event description

Description

Learning objectives

  • Develop a high level completion strategy for wells in a variety of situations.
  • Select tubing, packers, and completion flow control equipment.
  • Appraise/design a suitable flow barrier strategy and suitable intervention strategy.
  • Make recommendations on installation and retrieval practices for tubing, packers, etc. in different well types.
  • Identify key features/applicability of the main sand control, fracpack and well stimulation options.

The course is designed for

  • Drilling / Completion / Production / Intervention Engineers
  • Drilling / completion / Production / Intervention Managers
  • Persons responsible for all aspects of well construction and operation

Course outline

Completions Engineering Considerations Influencing Parameters

Completion Design Considerations Completion Types

Completion for the Life of the Well

Running the completion

Connecting Payzone to the Wellbore

Corrosion and Material Selection

Formation Damage

Perforating

Equipment for Naturally Flowing Wells

Artificial Lift (AL)

Overview WI and WO

Basic Principles of Hydrostatic Pressure

Well Shut-in Procedures and Kill Methods

Wireline Equipment and Services

Coil Tubing Equipment and Services

Hydraulic Workover (Snubbing) Equipment and Services

Workover and Potential Hazards

Rig Workover Services

Barriers and Containment Devices

Wireline Pressure Control

Coil Tubing Pressure Control

HWO (Snubbing) Pressure Control

Safety

Share with friends

Date and Time

Location

No.1 Jalan Utarid U5/13 Section U5

Kuala Lumpur, Selangor 40150

Malaysia

Save This Event

Event Saved