Conformity Assessment: Design and Production
Date and time
Location
Mary Ward House
5-7 Tavistock Place London WC1H 9SN United KingdomRefund Policy
Description
SEMINAR: CONFORMITY ASSESSMENT - DESIGN AND PRODUCTION
HOW TO MAKE PRODUCTS SAFE BEFORE SELLING
For designers, producers and sellers of electrical goods
Afternoon seminar and practical workshop investigating how to ensure safety standards are met across your supply chain from conception to sale
Perfect for manufactures, small businesses, importers and retailers, as well as being beneficial to enforcement authorities.
Join the likes of Dixons, John Lewis, Which, Howdens and Leigh Day.
Hear from industry experts on:
- Best practice for business: Mitigating risk through conformity assessment to ensure products are safe for market throughout your supply chain
Find out about the effective systems you need to demonstrate that products are safe and compliant with the law - required by large corporate organisations who are likely to have direct involvement with initial conceptual design, production and assembly through to end sale and to SMEs who are likely to source products from outside the EU and sell them in the UK.
- What to expect from PAS 7050 'Specifications for bringing safe products to market'
A new Publicly Available Specification (PAS) 7050 ‘Specification for bringing safe products to market’ is currently being developed to provide guidance to business of all sizes and to regulators (due for publication in early 2020). Hear from our expert panel on what to expect ahead of general release.
- Practical Workshop
Put the theory into practice carrying out a conformity assessment to determine whether products are ready for market.
Speakers
Martyn Allen Electrical Safety First (Chair)
David Bolton British Retail Consortium
Steve Brunige British Standards Institution
Steve Curtler Electrical Safety First
Andrew Gordon CE Compliance Solutions
Gordon Maddan Office for Product Safety and Standards
Richard Poate TUV-SUD
£125 plus VAT + booking fees
3 CPD points awarded
Lunch included