In the presentation “Eating the Elephant: ETCS Requirements for GB railway”, John Alexander of Network Rail described the Reference Design process that was implemented to elicit the GB specific requirements for the configuration of the ETCS product. This involved the production of some 31 documents to describe various aspects of operation on the GB railway and the ETCS capabilities to be applied to those. From these 31 documents 5 requirement sets were consolidated.

This presentation, by Alison Danahay, a Principal Systems Engineering and Integration Consultant at WSP | Parsons Brinckerhoff, follows on from John’s and describes several toolsets developed by WSP | Parsons Brinckerhoff to support and automate the processes for consolidation and documentation of the Reference Design itself and subsequent requirement specifications.

Alison Danahay is a professional Systems Engineer with 26+ years experience in engineering. She has been working with the Network Rail Safety Technical Engineering team on the definition of requirements to migrate current UK signalling and operations to ETCS Level 2.

Arrive from 17:00 for a 17:30 start.

Share with friends

Date and Time

Location

London Underground

55 Broadway

Westminster

London

SW1H 0XH

United Kingdom

View Map

Save This Event

Event Saved