Load Paths

Load Paths

CPD review of load paths as part of temporary works designs and demolition engineering methodologies

By Andun Engineering Consultants

Date and time

Location

Online

About this event

  • Event lasts 1 hour

Join us for a CPD webinar exploring the critical role of load testing in delivering safe, compliant, and structurally sound temporary works and demolition strategies.

This session will give engineers, designers, and project managers a clear understanding of how planned and properly executed load testing can validate design assumptions, highlight weaknesses, and reduce the risk of structural failure during high-risk construction phases.

From verifying structural capacity before façade retention to testing temporary platforms, props, and basements under real-world load conditions.

Organised by

Free