The link will connect the substation located in Knockraha (East Cork region in Ireland) to the La Martyre substation (Finistère). Recognised as a Project of Common Interest (PCI) by the European Union, the Celtic Interconnector project responds to European challenges in terms of energy transition and the fight against climate change by facilitating the move towards a low-carbon electricity mix. It will contribute to safer, more sustainable electricity at the best price.
This event plans to cover the following IOSH competencies: Health and safety governance (Technical), Integrating health and safety risk into business risk processes (Technical), and Innovation and creativity (Behavioural) at the Understand Level.
This event is open to members and non-members.
Places are reserved to a maximum of 20 so pre booking is essential on a first come first serve basis. Site visiting and joining instructions including required PPE will be circulated prior to the event. For site inforamtion please view: https://www.celticinterconnector.eu/ga/the-connection/